• Lifting equipment: Bridge Erection Machines, Rubber-Tyred Gantry Cranes, And Specialized Gantry Cranes for Tunnel Operations

The construction of elevated bridges and tunnel operations on the Baohan Expressway Dahena Bridge faced numerous challenges, including complex terrain, harsh construction conditions, and difficult transportation logistics. For the erection of this bridge, we provided bridge erection machines, rubber-tyred gantry cranes, and specialized gantry cranes for tunnel operations. These equipment solutions effectively addressed the challenges posed by the terrain and environment, ensuring smooth and safe construction processes.

We focus on offering flexible and reliable crane solutions, with our equipment designed to be compact, precise, and dependable. These features were crucial in overcoming the constraints of limited space, poor ventilation, and inadequate lighting conditions within the tunnels, providing essential support for the project's success.